Melrose Marine Service, Inc. builder of docks and bulkheads

      For over 43 years Melrose Marine Service, Inc (MMS) has constructed  piers, bulkheads and other marine structures. With experience in marine construction and a vast variety of other fields MMS has the capability to tackle many different types of projects, from simple floating docks to major marina reconstruction.

      MMS owns and maintains a fleet of equipment for both marine as well as  shore side projects. From Tug boats and Crane  Barges to land based Cranes, Trucks, and our Fabrication Facility, we are equipped to handle your project.

marine construction equipment, melrose tugboat Billy White and dockbuilding barge with crane

With concerns about using chemically treated lumber (CCA and Creosote) and their effects on the environment, MMS has had experience with a number of alternate materials. Vinyl decking products are low maintenance and do not rot or splinter like wood. Hardwood lumber, though only slightly more expensive than vinyl, is structurally stronger and appealing to the eye.

Town of Huntington town dock with hardood handrails Halesite, NY

Reconstruction Seawall at private residence in Huntington Bay, NY. Deteriorated concrete seawall is refaced with Fiber Reinforced Polymer (FRP or Fiberglass) sheet piling. Due to the proximity to the dwelling the new wall, the wall is tied back using Helical Tiebacks that are installed beneath the structure. See Underpinning page.

Dock Replacement at the Brewer Capri West Marina in Port Washington, NY

Work to include replacing the Sea-lane and Bimini docks. New docks are decked with Ipe tropical hardwood decking.

All types of Marine Construction -  Docks, Bulkheads, Dredging, Helical Tiebacks, Crane Service, Ironworking, Salvage, Gangways and Floating Docks

 

Serving Long Island’s North Shore and Peconic Bay since 1968

 

Oyster Bay Marine Center, Oyster Bay New York, Geoguard 50 FRP bulkhead and 110 ft long, 50 ton Travel lift pierSeawall Reconstruction - Huntington Bay, NY, Everlast Synthetic Products 26.1 Composite sheathing thed back with Chance Helical tiebacksBrewer Capri Marina, Port Washington, NY. Floating dock replacement

New Barge Under

Construction

Click here for details

Construction of a 165’ Fiber Reinforced Composite bulkhead and a 50 ton travel lift pier at the Oyster Bay Marine Center located in Oyster Bay, NY. To be completed for the Hauling Season fall 2011

(631) 477-1546